ERP: SAP ECC
Automation on ECC without touching the core.
We build alongside ECC using RFC, IDoc, and the OData gateway your Basis team already controls. No core modifications, no rip-and-replace.
Why shops get stuck
SAP ECC runs the business.The workflow layer around it is still manual.
- Every change in ECC goes through a multi-quarter transport cycle, so workflow fixes never ship.
- MM, SD, and FI data are available but nobody can query across them without a BW request.
- Users bypass the system with spreadsheets because the dialog screens are too slow for daily work.
What we ship
Builds we deliver on SAP ECC,without touching the core.
- RFQ intake with condition technique pricing applied before the line posts
- Three-way match against MM-GR and FI-AP with tolerance groups you already use
- Cross-module margin views over SD billing, CO-PA, and MM movements
- Verification UI for CSRs that writes back via standard BAPIs
Integration surface
The interfaces your team already owns.
RFC, IDoc, OData, BAPI, CDS views. Extractors stay inside your Basis team's change control.
Core workflows
Six workflows we build.
Each build is custom to your ERP and your team. Typical timeline: 3 to 6 weeks from kickoff to live.
Quoting
We read incoming RFQs and match them to your SKUs. Your CSR confirms and sends. Build: 1 to 2 weeks.
Learn more →02Order Entry
We parse POs from email, EDI, and PDFs. Your order desk verifies and releases. Build: 1 to 2 weeks.
Learn more →03Price Optimization
We surface margin and elasticity from your ERP data. Your pricing team decides. Build: 1 week.
Learn more →04Accounts Payable
We three-way match in seconds. Your AP lead approves. Build: 1 to 2 weeks.
Learn more →05Accounts Receivable
We auto-apply cash and draft dunning. Your AR lead sends. Build: 1 week.
Learn more →06Lead Generation
We score your install base for expansion and risk. Your sales leader prioritizes. Build: 1 week.
Learn more →Integrations
We build onthe systems you already run.
Deepest on SAP, Oracle, Dynamics, Infor, and Epicor. If what you run is not here, tell us. We will tell you honestly whether we are the right fit.
+ SAP ECC, S/4HANA, JD Edwards, Dynamics CE / F&O, EWM, PM, MM, QM, MII, Kinaxis, ServiceNow, and more
Proof of delivery
What they asked for, how long it took,who runs it now.
Manufacturing · Food manufacturing
From four hours per quote to verified quotes in twenty minutes
Food manufacturer
2 days
from kickoff to live intake, matching, and verification
Read case study →
Manufacturing · Aerospace plastics manufacturing
From weeks of market research to same-day manufacturing prioritization
LP Aero
80%
reduction in data entry and collection time
Read case study →
Manufacturing · Geotechnical field services
Paper borehole logs to structured, model-ready data, at enterprise scale
BoreDM
~$1M
in labor savings
Read case study →Get started
Tell us what your teamspends its afternoons on.
Send us your ERP and the workflow that hurts the most. We will tell you what we would build, how long it would take, and what it would cost.
See ResultsPrefer to talk live?


